Power direct drive maxi 380x5mm /M5, motor 700,ball bearing, waterproof

Product no.: 3.3293w
48.00
Price incl. VAT, plus delivery
Delivery weight: 0.15 kg


Power direct drive maxi 380x5mm /M5, motor 700,ball bearing, waterproof

- with aluminium motor flange and built-in mounting foot and coupling
 
provide a rigid connection between motor and shaft tube
dissipate heat from the motor to the shaft tube
no loss of power due to misalignment
simple, quick assembly
Bearing sleeve with ball bearing and shaft sealing ring
Power direct drives with 5mm shaft and M5 thread. A nylon bearing is fitted to prevent the shaft from swinging.
The shaft can be shortened on the propeller side. The bearing sleeve is not glued to the shaft tube.
With elastic shaft coupling
 
Motor flange 29mm (700er Motor)
Shaft Ø 5mm
Schaft length 400
Tube- Ø 9mm
Tube length 330mm
Length with Flange 380
Thread M5
Thread length 14mm
Center bearing Nylon
Bearing Prop side ball bearing with radial shaft sealing ring
Thrust bearing Nylon
coupling Elastic 5x5mm
 
- inexpensive
- easy change or repair of the engine. Even if it is difficult to reach the engine bolts because the stern or fixtures are too tight or the engine bolts are difficult or impossible to reach. With this drive system, you only work from above.
 
Assembly of the power direct shaft system
Drill out the shaft passage at the stern and push the shaft system through. The shaft tube should protrude at least 1-2mm so that the thrust washer is not glued together. 2.
2. make a support out of wood, GRP or similar and fit it into the fuselage under the coupling flange.
Place the two drive-in nuts on the support and tighten them from above with the screws. If necessary, drill holes for the screws in the support.
    Glue the support into the fuselage. 4.
Glue the drive-in nuts to the support with 2K glue. Lightly grease the screws to prevent them from sticking.
 
Dismantling the moootor
Unscrew the screws from the drive-in nuts. Loosen the two M3 grub screws in the flange and the coupling.
Pull the motor with the coupling flange and coupling off the tube.
Now you can easily work on or change the motor. The assembly is done in reverse order. The previous installation position is reached again by the glued drive-in nuts. Important: Do not use any frames present in the boat to install the coupling flange. Glue an extra underlay into the boat. Otherwise you will lose the advantages of easy disassembly. Assembly or disassembly from above is then no longer possible.
 
 

 

Customers who bought this product also bought

3.4083
3.70 *
Delivery weight: 0.005 kg
3.4080
4.90 *
Delivery weight: 0.01 kg
3.4095
7.85 *
Delivery weight: 0.02 kg
3.4096
7.85 *
Delivery weight: 0.02 kg
Delivery weight: 0.05 kg
*
Prices incl. VAT, plus delivery

Browse this category: ball bearing, pressure watertight